← All templates

Horizon Europe RIA/IA proposal, Part B (heria)

Tristan Miller's heria class (in TeX Live), a LaTeX conversion of the official Horizon Europe Part B template (version 5.1) for Research and Innovation Actions and Innovation Actions, with its skeleton proposal: the official headings and instructions of Excellence, Impact and Implementation, and the participant, work-package, deliverable, milestone, risk, staff-effort and cost tables generated from the data you enter.

Create an account to use this
Category
Grant
Document class
heria (heria.cls) — ships with TeX Live
Workflow
Grant / research proposal — submissions and revision rounds
Author
Tristan Miller (heria)
Source
Tristan Miller (heria)
Licence
heria.cls: LaTeX Project Public License (installed with TeX). The sample text is Tristan Miller (heria)'s, provided for authors preparing a submission.

These are the publisher’s own files. This project starts from Tristan Miller (heria)’s package for this publication — their manuscript, their heria.cls, their bibliography style — so what compiles here is what they would have given you.

Tristan Miller (heria) serves this exact file to European Commission (Horizon Europe) and 2 other titles. Check Tristan Miller (heria)’s author pages for the current instructions.

Where this differs from the publisher’s download.

  • Note: A community template, not issued by the European Commission; check the current call's page limits and headings. The page indications are the official template's; the class does not enforce the overall page limit.

What you get

  • heria-proposal.tex — the file that is compiled · 8 KB

These become your files. Editing them afterwards changes your project and nothing else — a project owns its files from the moment it is made.

Link to this template. Send it to a student or co-author: it starts a new paper in this template, through sign-up if they need an account.

https://manulyx.com/start/ctan-heria

Source

heria-proposal.tex — the file that is compiled · 8 KB
\documentclass[showinstructions]{heria}

\templateversion{5.1}

\usepackage{caption}

\title{Your paper}
\callname{insert call name}
\callidentifier{HORIZON-XX0-0000-XXXXX-00-XXXXX}
\calltopic{HORIZON-XX0-0000-XXXXX-00-00}

\begin{document}
\maketitle

\heinstructions{participants}

\section*{List of participants}[][][1 page]\label{sec:listofparticipants}

\participant
  {University of Upper Freedonia} % Participant organisation name
  {UUF} % Participant short name
  {AT} % Country

\participant
  {Molvania State University} % Participant organisation name
  {MSU} % Participant short name
  {DE} % Country

\participant
  {Institute for Underwater Basket Weaving} % Participant organisation name
  {IUBW} % Participant short name
  {UK} % Country

\makeparticipantstable

\heinstructions{participant-numbering}

\section{Excellence}\label{sec:excellence}

\heinstructions{excellence}

\subsection{Objectives and ambition}[][][4 pages]\label{sec:objectives}

\heinstructions{objectives}

\subsection{Methodology}[][][14 pages]\label{sec:methodology}

\heinstructions{methodology}

\subsubsection{Overall methodology}[][][10 pages]\label{sec:overallmethodology}

\subsubsection{Connections to other research activities}[][][1 page]\label{sec:connections}

\subsubsection{Interdisciplinarity}[][][1/2 page]\label{sec:interdisciplinarity}

\subsubsection{Gender dimension}[][][1 page]\label{sec:gender} 

\subsubsection{Open science}[][][1 page]\label{sec:openscience}


\section{Impact}\label{sec:impact}

\heinstructions{impact}

\subsection{Project's pathways towards impact}[][][3 pages]\label{sec:pathways}

\heinstructions{pathways}

\subsection{Measures to maximise impact: Dissemination, exploitation and communication}[][][3 pages, excluding section~\IfLabelExistsTF{sec:summary}{\ref{sec:summary}}{2.3}]\label{sec:measures}

\heinstructions{measures}


\subsection{Summary}[][][(OPTIONAL~-- Please remove this section if not used)]\label{sec:summary}

\heinstructions{summary}

\noindent Figure~\ref{fig:impact} on
pages~\pageref{fig:impact}--\pageref{fig:impact2} presents a tableau
summarising the project's impact.

\begin{SidewaysFigure}
\begin{summarycanvas}%
  \begin{summarybox}{SPECIFIC NEEDS}
    \heinstructions*{summary-specificneeds}
  \end{summarybox}%
  \begin{summarybox}{EXPECTED RESULTS}
    \heinstructions*{summary-expectedresults}
  \end{summarybox}%
  \begin{summarybox}{D \& E \& C MEASURES}
    \heinstructions*{summary-decmeasures}
  \end{summarybox}%
\end{summarycanvas}%
\caption{Impact summary tableau}\label{fig:impact}
\end{SidewaysFigure}

\begin{SidewaysFigure}
\begin{summarycanvas}%
  \begin{summarybox}{TARGET GROUPS}
    \heinstructions*{summary-targetgroups}
  \end{summarybox}%
  \begin{summarybox}{OUTCOMES}
    \heinstructions*{summary-outcomes}
  \end{summarybox}%
  \begin{summarybox}{IMPACTS}
    \heinstructions*{summary-impacts}
  \end{summarybox}%
\end{summarycanvas}%
\ContinuedFloat%
\caption{Impact summary tableau (continued)}\label{fig:impact2}
\end{SidewaysFigure}

\section{Quality and efficiency of the implementation}\label{sec:quality}

\heinstructions{quality}

\subsection{Work plan and resources}[][][12 pages (17 pages for topics using lump sum funding)~-- including tables]\label{sec:workplan}

\heinstructions{workplan}

\subsubsection*{Table 3.1a: List of work packages}

\heinstructions{tables}

\makeworkpackagestable

\subsubsection*{Table 3.1b: Work package description}

\workpackage
  {ra} % unique ID (used only for cross-referencing deliverables, etc. in LaTeX)
  {Requirements analysis} % work package title
  {UUF}% Lead participant (using short name)
  {1}% Start month
  {6}% End month

\heinstructions{wp-objectives}
\begin{objectives}
\item First objective
\item Second objective
\item \dots
\end{objectives}

\begin{descriptionofwork}
\heinstructions{wp-description}
\task
  {Literature survey} % task name
  {UUF} % short name of lead participant
  {MSU} % other participants (or "all participants", etc.)
  {1--6} % month(s)
  In this task, we will read a lot of books, and\dots
\end{descriptionofwork}

\deliverable
  {dmp} % deliverable name
  {Data management plan} % short description
  {MSU} % short name of lead participant
  {DMP}% type; see Table 3.1c instructions for valid values
  {PU}% dissemination level; see Table 3.1c instructions for valid values
  {6}% delivery date (in months from beginning of project)

\workpackage%
  {integration}% Unique ID (used only for cross-referencing deliverables, etc. in LaTeX)
  {System integration}% Title
  {UUF}% Lead partner (using short name ID)
  {1}% Start month
  {20}% End month

\heinstructions{wp-objectives}
\begin{objectives}
\item First objective
\item Second objective
\item \dots
\end{objectives}

\begin{descriptionofwork}
\heinstructions{wp-description}
\task
  {Develop prototype} % task name
  {UUF} % short name of lead participant
  {MSU} % other participants (or "all participants", etc.)
  {1--10} % month(s)
  In this task, we will do lots of coding, and\dots
\end{descriptionofwork}

\deliverable
  {demo} % deliverable name
  {Working demo system} % short description
  {IUBW} % short name of lead participant
  {DEM}% type; see Table 3.1c instructions for valid values
  {SEN}% dissemination level; see Table 3.1c instructions for valid values
  {10}% delivery date (in months from beginning of project)

\workpackage%
  {dissemination}% Unique ID (used only for cross-referencing deliverables, etc. in LaTeX)
  {Dissemination and exploitation}% Title
  {UUF}% Lead partner (using short name ID)
  {7}% Start month
  {20}% End month

\heinstructions{wp-objectives}
\begin{objectives}
\item First objective
\item Second objective
\item \dots
\end{objectives}

\begin{descriptionofwork}
\heinstructions{wp-description}
\task
  {Organise public workshop} % task name
  {MSU} % short name of lead participant
  {all participants} % other participants (or "all participants", etc.)
  {7--10} % month(s)
  In this task, we will unite the greatest minds\dots
\end{descriptionofwork}

\deliverable
  {proceedings} % deliverable name
  {Workshop proceedings} % short description
  {MSU} % short name of lead participant
  {R}% type; see Table 3.1c instructions for valid values
  {PU}% dissemination level; see Table 3.1c instructions for valid values
  {11}% delivery date (in months from beginning of project)

\subsubsection*{Table 3.1c: List of deliverables}

\heinstructions{deliverables}

\makedeliverablestable

\heinstructions{deliverables-key}

\subsubsection*{Table 3.1d: List of milestones}

\milestone
  {Define use cases} % milestone name
  {WP1} % related work package(s)
  {12} % month due
  {expert review} % means of verification

\milestone
  {Minimum viable product (MVP)} % milestone name
  {WP2} % related work package(s)
  {20} % month due
  {expert review} % means of verification

\heinstructions{milestones}
\makemilestonestable

\subsubsection*{Table 3.1e: Critical risks for implementation}

\criticalrisk
  {Datasets are not available} % description of risk
  {Low} % Likelihood
  {High} % Severity
  {WP1, WP2} % Work package(s) involved
  {We'll find new ones} % Proposed risk-mitigation measures

\heinstructions{criticalrisks}
\makecriticalriskstable

\subsubsection*{Table 3.1f: Summary of staff effort}

\staffeffort
  {UUF} % short name of participant
  {ra} % name of work package
  {23} % number of person-months
\staffeffort{UUF}{integration}{6}
\staffeffort{UUF}{dissemination}{11}
\staffeffort{MSU}{ra}{18}
\staffeffort{MSU}{integration}{17}
\staffeffort{MSU}{dissemination}{1}
\staffeffort{IUBW}{ra}{21}
\staffeffort{IUBW}{integration}{14}
\staffeffort{IUBW}{dissemination}{5}

\heinstructions{staffeffort}
\makestaffefforttable

\subsubsection*{Table 3.1g: `Subcontracting costs' items}

\heinstructions{subcontractingcosts}

\subcontractingcost
  {UUF} % short name of participant
  {25000} % cost in euros
  {Design project website} % description of tasks and justification

\makesubcontractingcoststable

\subsubsection*{Table 3.1h: `Purchase costs' items (major equipment costs)}

\heinstructions{purchasecosts}

\equipmentcost
  {IUBW} % short name of participant
  {2120} % cost in euros
  {Computing cluster} % details on need for equipment

\makeequipmentcoststable

\subsection{Capacity of participants and consortium as a whole}[][][3 pages]\label{sec:capacity}

\heinstructions{capacity}



\heinstructions{annexes}
\end{document}

The first page, as this template compiles today. Click it to enlarge, and again to shrink. Open the file ↗