← All templates

Beamer slides (Warsaw)

Built-in Warsaw theme with shaded section and subsection bars, set up as a project review.

Create an account to use this
Category
Presentation
Document class
beamer (beamer.cls) — ships with TeX Live
Workflow
Presentation — no revision rounds
Author
Till Tantau et al., beamer
Source
CTAN
Licence
beamer.cls: The LaTeX Project Public License 1.3c; GNU General Public License, version 2 or newer. Sample text: Manulyx, CC0 1.0 (free to use, no conditions).

What you get

  • main.tex — the file that is compiled · 2 KB
  • references.bib · 342 B

These become your files. Editing them afterwards changes your project and nothing else — a project owns its files from the moment it is made.

Link to this template. Send it to a student or co-author: it starts a new paper in this template, through sign-up if they need an account.

https://manulyx.com/start/ctan-presentation-beamer-warsaw

Source

main.tex — the file that is compiled · 2 KB
\documentclass{beamer}

\usetheme{Warsaw}
\setbeamertemplate{navigation symbols}{}

\usepackage{amsmath}
\usepackage{booktabs}
\usepackage{tikz}

\title[Project review]{Your paper}
\subtitle{Annual project review}
\author[A.~Name]{Author Name \and Second Author}
\institute[Consortium]{Project Consortium}
\date{\today}

\begin{document}

\frame{\titlepage}

\begin{frame}{Agenda}
  \tableofcontents
\end{frame}

\section{Objectives}
\subsection{Planned}

\begin{frame}{Objectives for the period}
  \begin{itemize}
    \item O1: deliver the prototype.
    \item O2: complete the field trial.
    \item O3: publish the first results, extending \cite{shannon1948}.
  \end{itemize}
\end{frame}

\section{Progress}
\subsection{Work packages}

\begin{frame}{Status by work package}
  \centering
  \begin{tabular}{llc}
    \toprule
    WP & Title & Complete (\%) \\
    \midrule
    1 & Requirements & 100 \\
    2 & Prototype    & 80 \\
    3 & Field trial  & 40 \\
    \bottomrule
  \end{tabular}
\end{frame}

\subsection{Budget}

\begin{frame}{Spending against plan}
  Cumulative spending $S(t)$ against the linear plan $P(t) = Bt/T$ for budget $B$ and duration $T$:
  \begin{equation}
    \Delta(t) = \frac{S(t) - P(t)}{B}.
  \end{equation}
  \begin{figure}
    \centering
    \begin{tikzpicture}[scale=0.8]
      \draw[->] (0,0) -- (5,0) node[right] {$t$};
      \draw[->] (0,0) -- (0,3) node[above] {cost};
      \draw[dashed] (0,0) -- (4.5,2.7);
      \draw[thick, blue] (0,0) -- (1,0.4) -- (2,1.0) -- (3,1.9);
    \end{tikzpicture}
    \caption{Plan (dashed) and actual spending (solid).}
  \end{figure}
\end{frame}

\section{Next period}
\subsection{Plan}

\begin{frame}{Risks and next steps}
  \begin{block}{Main risk}
    Delay of the field trial; mitigation agreed with partners.
  \end{block}
  \begin{itemize}
    \item Finish WP2.
    \item Run WP3 at two further sites.
  \end{itemize}
\end{frame}

\begin{frame}{Publications}
  \bibliographystyle{plain}
  \bibliography{references}
\end{frame}

\end{document}
references.bib · 342 B

Loading…

The first page, as this template compiles today. Click it to enlarge, and again to shrink. Open the file ↗