Beamer slides (Warsaw)
Built-in Warsaw theme with shaded section and subsection bars, set up as a project review.
Create an account to use this
- Category
- Presentation
- Document class
beamer(beamer.cls) — ships with TeX Live- Workflow
- Presentation — no revision rounds
- Author
- Till Tantau et al., beamer
- Source
- CTAN
- Licence
- beamer.cls: The LaTeX Project Public License 1.3c; GNU General Public License, version 2 or newer. Sample text: Manulyx, CC0 1.0 (free to use, no conditions).
What you get
main.tex— the file that is compiled · 2 KBreferences.bib· 342 B
These become your files. Editing them afterwards changes your project and nothing else — a project owns its files from the moment it is made.
Link to this template. Send it to a student or co-author: it starts a new paper in this template, through sign-up if they need an account.
https://manulyx.com/start/ctan-presentation-beamer-warsaw
Source
main.tex — the file that is compiled · 2 KB
\documentclass{beamer}
\usetheme{Warsaw}
\setbeamertemplate{navigation symbols}{}
\usepackage{amsmath}
\usepackage{booktabs}
\usepackage{tikz}
\title[Project review]{Your paper}
\subtitle{Annual project review}
\author[A.~Name]{Author Name \and Second Author}
\institute[Consortium]{Project Consortium}
\date{\today}
\begin{document}
\frame{\titlepage}
\begin{frame}{Agenda}
\tableofcontents
\end{frame}
\section{Objectives}
\subsection{Planned}
\begin{frame}{Objectives for the period}
\begin{itemize}
\item O1: deliver the prototype.
\item O2: complete the field trial.
\item O3: publish the first results, extending \cite{shannon1948}.
\end{itemize}
\end{frame}
\section{Progress}
\subsection{Work packages}
\begin{frame}{Status by work package}
\centering
\begin{tabular}{llc}
\toprule
WP & Title & Complete (\%) \\
\midrule
1 & Requirements & 100 \\
2 & Prototype & 80 \\
3 & Field trial & 40 \\
\bottomrule
\end{tabular}
\end{frame}
\subsection{Budget}
\begin{frame}{Spending against plan}
Cumulative spending $S(t)$ against the linear plan $P(t) = Bt/T$ for budget $B$ and duration $T$:
\begin{equation}
\Delta(t) = \frac{S(t) - P(t)}{B}.
\end{equation}
\begin{figure}
\centering
\begin{tikzpicture}[scale=0.8]
\draw[->] (0,0) -- (5,0) node[right] {$t$};
\draw[->] (0,0) -- (0,3) node[above] {cost};
\draw[dashed] (0,0) -- (4.5,2.7);
\draw[thick, blue] (0,0) -- (1,0.4) -- (2,1.0) -- (3,1.9);
\end{tikzpicture}
\caption{Plan (dashed) and actual spending (solid).}
\end{figure}
\end{frame}
\section{Next period}
\subsection{Plan}
\begin{frame}{Risks and next steps}
\begin{block}{Main risk}
Delay of the field trial; mitigation agreed with partners.
\end{block}
\begin{itemize}
\item Finish WP2.
\item Run WP3 at two further sites.
\end{itemize}
\end{frame}
\begin{frame}{Publications}
\bibliographystyle{plain}
\bibliography{references}
\end{frame}
\end{document}
references.bib · 342 B
Loading…
The first page, as this template compiles today. Click it to enlarge, and again to shrink. Open the file ↗